News & Resources

Dallas North Tollway Interchange at Night

 
DALLAS NORTH TOLLWAY IN DALLAS TO CLOSE FOR CONSTRUCTION THIS WEEKEND
First of Two Weekend Closures Required for Bridge Repair

Dallas North Tollway closures scheduled for the following weekends:

Friday, March 8 at 10 p.m. through Monday, March 11 at 5 a.m. 
• All lanes of southbound Dallas North Tollway (DNT) from I-635 to Royal Ln.
• East- and westbound I-635 to southbound DNT direct-connector ramps
• Southbound Harvest Hill Rd., Inwood Rd., and Forest Ln. entrance ramps
• Southbound Royal Ln. exit ramp
• Northbound left lane of DNT from Royal Ln. to Forest Ln.

Friday, March 22 at 10 p.m. through Monday, March 25 at 5 a.m. 
• All lanes of southbound Dallas North Tollway (DNT) from I-635 to Royal Ln.
• East- and westbound I-635 to southbound DNT direct-connector ramps
• Southbound Harvest Hill Rd., Inwood Rd., and Forest Ln. entrance ramps
• Southbound Royal Ln. exit ramp
• Northbound left lane of DNT from Royal Ln. to Forest Ln.

Additional closure:
Friday, March 8 at 10 p.m. through mid-April (Continuous closure)
• All lanes of east- and westbound Northaven Rd. over the DNT

Detours: 
• Eastbound Northaven Rd.: Drivers will turn north on Inwood Rd. and make a right on Forest Ln. They will turn right at Preston Rd. and continue to Northaven Rd.
• Westbound Northaven Rd.: Drivers will turn north on Preston Rd. and make a left on Forest Ln. They will turn left at Inwood Rd. and continue to Northaven Rd.

See map below for additional information.
Message boards will be placed nearby to alert drivers of the closure.
All closures are subject to weather conditions and will be postponed, if necessary. Please use caution in the construction area.
For more information about upcoming lane closures and traffic-related news along NTTA roadways, visit Traffic Updates on NTTA.org.

DNT Full Closure Map


 

Top Top Arrow Up