Bid Summaries and Contract Awards

Bid summaries include vendors who responded to the bid opportunities listed. Totals listed on the bid summary are for comparison only. Bids will be evaluated for completeness and compliance with specifications by the Procurement Division and the applicable departments.

Debrief 

A prospective vendor may request a debriefing on NTTA’s evaluation of its response. A debriefing should be seen by a prospective vendor as an opportunity to improve its competitiveness. NTTA will provide the debriefing within a reasonable time after the debriefing request is received. 

Contract Awards 

To research awarded contracts for completed procurements, click HERE to use the Marketplace Advanced Search page. Click HERE for assistance using the Marketplace Advanced Search page.

 
To view a bid tabulation, click on the bid numbers below.

 

RFB: DNT Segment 1 Curb Inlet Repairs
RFB: 05370-DNT-01-CN-PD
Pre-Bid meeting:None
Responses Due: June 17, 2021 at 11:00 a.m. CT

RFB: Aftermarket Medium & Heavy-Duty Truck Parts
RFB: 05322-NTT-00-GS-MA
Pre-Bid meeting:None
Responses Due: April 15, 2021 at 11:00 a.m. CT

RFB: Operations Building at Main Lane Plaza 7 HVAC Upgrade
RFB: 05340-PGB-01-GS-MA
Pre-Bid meeting:March 25, 2021 @ 11:00 a.m. CT
Responses Due: April 15, 2021 at 11:00 a.m. CT

RFB: Landscape Mulch Installation
RFB: 05376-NTT-00-GS-MA
Pre-Bid meeting:None
Responses Due: April 15, 2021 at 11:00 a.m. CT

RFB: Landscape Plants
RFB: 05377-NTT-00-GS-MA
Pre-Bid meeting:None
Responses Due: April 15, 2021 at 11:00 a.m. CT

RFB: 5900 W. Plano Parkway Reroofing
RFB: 05029-GEC-00-GS-MA
Pre-proposal meeting:January 07, 2021 @ 10:00 a.m. CT
Responses Due: February 02, 2021 at 11:00 a.m. CT

RFB: International HV607 Dump Truck & MV607 Flatbed Trucks
RFB: 05314-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: January 14, 2021 at 11:00 a.m. CT

RFB: Fleet Vehicle Purchase
RFB: 05315-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: January 14, 2021 at 11:00 a.m. CT

RFC: Terex TL37 Aerial Bucket Trucks
RFC: 05332-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: January 05, 2021 at 11:00 a.m. CT

RFB: Sweeper & Sewer Cleaner Parts & Svc
RFB: 05321-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: January 21, 2021 at 9:00 a.m. CT

RFB: Crash Cushion Attenuators
RFB: 05308-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: February 23, 2021 at 10:00 a.m.

RFB: Vehicle Wraps and Sun Screening Materials
RFB: 05318-NTT-00-GS-TM
Pre-bid meeting: None
Responses Due: February 26, 2021 at 10:00 a.m.

RFB: DNT Seg. 1 & @ and AATT Sign Replacement
RFB: 05033-DNT-00-CN-PD
Pre-bid meeting: January 11, 2021 @ 1:00 p.m. CT
Responses Due: January 21, 2021 @ 3:00 p.m. CT

RFB: CTP Segment 1 & 2 Restriping
RFB: 05265-SRT-00-CN-PD
Pre-bid meeting: January 11, 2021 @ 2:15 p.m. CT
Responses Due: January 21, 2021 @ 3:00 p.m. CT

RFB: CTP Segment 1 & 2 Restriping
RFB: 05259-CTP-00-CN-PD
Pre-bid meeting: N/A
Responses Due: January 21, 2021 at 11:00 a.m. CT

RFB: SRT Segment 1 & 2 Frontage Rd. Restriping
RFB: 05260-SRT-00-CN-PD
Pre-bid meeting: N/A
Responses Due: January 21, 2021 at 11:00 a.m. CT

RFB: SRT Segment 3 Frontage Rd. Restriping
RFB: 05261-SRT-00-CN-PD
Pre-bid meeting: N/A
Responses Due: January 21, 2021 at 11:00 a.m. CT

RFB: Remove and Replace RPMs at DNT and LLTB
RFB: 05262-NTT-00-CN-PD
Pre-bid meeting: N/A
Responses Due: January 21, 2021 at 11:00 a.m. CT

RFB: Addison Airport Tunnel Restriping
RFB: 05276-AAT-00-CN-PD
Pre-bid meeting: N/A
Responses Due: January 21, 2021 at 11:00 a.m. CT

RFB: Fire Alarm & Backflow Inspection
RFB: 05294-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020

RFB: Truck- and Trailer-Mounted Mobile Attenuators
RFB: 05284-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020

RFB: VMWARE LICENSES AND SUPPORT
RFB: 05335-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: November 30, 2020 at 2:00 p.m. Central Time

RFB: SERVICENOW SUBSCRIPTIOIN
RFB: 05334-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: November 30, 2020 at 1:00 p.m. Central Time

RFB: ITS VIDEO TORAGE
RFB: 05337-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: November 30, 2020 at 4:00 p.m. Central Time

RFB: Systemwide Pavement Profiling
RFB: 05282-NTT-00-CN-PD
Pre-Bid meeting: November 10, 2020 at 1:00 p.m. CT
Responses Due: November 19, 2020 at 11:00 a.m. CT

RFB: Zero-Turn Riding Mowers
RFB: 05283-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020 at 11:00 a.m. CT

RFB: Dell Ruggedized Laptop
RFB: 20046-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: October 29, 2020 at 1:00 p.m. Central Time

RFB: Truck- & Trailer-Mounted Mobile Attenuators
RFB: 05284-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020 at 11:00 a.m. CT

RFB: Zero-Turn Riding Mowers
RFB: 05283-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020 at 11:00 a.m. CT

RFB: Fire Alarm & Backflow Inspection and Repair
RFB: 05294-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 1, 2020 at 11:00 a.m. CT

RFB: Security Fencing
RFB: 19035R-FOC-00-GS-MA
Pre-bid meeting: N/A
Responses Due: August 24, 2020 at 10:00 a.m. Central Time

RFB: HVAC Replacement/Upgrade
RFB: 05264-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: August 10, 2020 at 1:00 p.m. Central Time

RFB: DNT 4B Frontage Rd. Construction
RFB: 04151-DNT-06-CN-PD
Pre-bid meeting:
Responses Due: August 20, 2020 at 11:00 a.m. CT

RFB: Dallas North Tollway at Walnut Hill Overpass Wingwall Repair
RFB: 05253-DNT-01-CN-PD
Pre-bid meeting: July 21, 2020 at 11:00 a.m. Central Time
Responses Due: July 30, 2020 at 11:00 a.m. Central Time

RFB: Aftermarket Brooms for Tymco & Elgin Sweepers
RFB: 05149-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: June 11, 2020 @ 11:00 a.m.

RFB: Ballasts, Lamps, including Lamp Disposal
RFB: 05009-NTT-00-GS-MA
Pre-bid meeting: N/A
Responses Due: October 23, 2019 @ 1:30 p.m.

RFB: Chisholm Trail Parkway Mainlane Shoulder Rehabilitation
RFB: 05212-CTP-00-CN-PD
Pre-bid meeting: June 16, 2020 at 11:00 a.m. Central Time
Responses Due: June 30, 2020 at 11:00 a.m. Central Time

RFB: SRT @ US 75 Bent Cap Sealing
RFB: 05188-SRT-03-CN-PD
Pre-bid meeting: N/A
Responses Due: June 18, 2020 at 11:00 a.m. CT

RFB: Construction of DNT Segment 4 Wall Stabilization
RFB: 05040-DNT-04-CN-PD
Pre-bid meeting: N/A
Responses Due: June 18, 2020 at 11:00 a.m. CT

RFB: Data Center Backups -Hardware
RFB: 05244-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: May 29, 2020 at 1:00 p.m. Central Time

RFB: APC UPS REFRESH
RFB: 05240-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: May 5, 2020 at 1:00 p.m. Central Time

RFB: General Contracting Services for Light Commercial Construction & Renovationsy
RFB: 05189-NTT-00-GS-MA
Pre-bid meeting: May 14, 2020 at 11:00 a.m. Central Time
Responses Due: May 26, 2020 at 11:00 a.m. Central Time

RFB: SRT @ US 75 Sloan Creek Erosion Mitigation
RFB: 04927-SRT-03-CN-PD
Pre-bid meeting: May 12, 2020 @ 11:00am CT
Responses Due: May 21, 2020 at 11:00 a.m. CT

RFB: DNT Royal Ln Bridge Deck Rehabilitation
RFB: 05081-DNT-01-CN-PD
Pre-bid meeting: April 28, 2020 at 11:00 a.m. CT
Responses Due: May 21, 2020 at 11:00 a.m. CT

RFB: Bulk Regular Unleaded & Low Sulfur Diesel Fuel Purchase and Delivery
RFB: 05169-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: May 7, 2020 at 1:00 p.m. Central Time

RFB: Dallas North Tollway Seg. 2 Roadway Improvements
RFB: 19038-DNT-01-CN-PD
Pre-bid meeting: May 11, 2020 at 2:00 p.m. CT
Responses Due: May 21, 2020 at 11:00 a.m. CT

RFB: APC UPS REFRESH
RFB: 05240-NTT-00-GS-IT
Pre-bid meeting: NONE
Responses Due: May 5, 2020 at 1:00 p.m. Central Time

RFB: Dallas North Tollway at Walnut Hill Lane WingWall Repair
RFB: 19038-DNT-01-CN-PD
Pre-bid meeting: NONE
Responses Due: May 04, 2020 at 11:00 a.m. CT

RFB: 5910 Window Resealing Project
RFB: 05200-GEC-GS-MA
Pre-bid meeting: NONE
Responses Due: March 31, 2020 at 10:00 a.m.

RFB: Automotive Paint & Body Repair Services
RFB: 05183A-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: April 16, 2020 at 11:00 a.m. Central Time

RFB: Water Jet Equipment
RFB: 05186-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: April 7, 2020 at 10:00 a.m Central Time

RFB: CISCO ISE AUTHENTICATION SERVICES REFRESH
RFB: 05227-NTT-00-GS-IT
Pre-bid meeting: NONE
Responses Due: April 10, 2020 at 1:00 p.m. Central Time

RFB: Promotional Products
RFB: 19032-NTT-00-GS-CS
Pre-bid meeting: NONE
Responses Due: March 3, 2020 at 2:00 p.m. Central Time/p>

RFB: Multi-Year All Steel Furniture Contract
RFB: 05190-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: March 16, 2020 at 11:00 a.m. Central Time

RFB: Powerfoil x3.0 HVLV Fan
RFB: 20000-FOC-04-GS-MA
Pre-bid meeting: NONE
Responses Due: March 17, 2020 at 11:00 a.m. Central Time

RFB:Addison Airport Toll Tunnel Sump Pump Wiring System
RFB: 04855A-AAT-01-GS-MA
Pre-bid meeting: January 07, 2020 at 11:00 a.m. Central Time
Responses Due: January 23, 2020 at 11:00 a.m. Central Time

RFB: Electric Cooper Wire
RFB: 05151-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: March 10, 2020 at 11:00 a.m. Central Time

RFB: Aluminum & Steel
RFB: 05148-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: January 23, 2020 at 11:00 a.m. CT

RFB: Extruded Aluminum Sign Panels
RFB: 05150-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: January 23, 2020 at 11:00 a.m. CT

RFB: Fleet Vehicles
RFB: 05127-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: January 23, 2020 at 11:00 a.m. Central Time

RFB: International Dump Trucks
RFB: 05134-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: January 23, 2020 at 11:00 a.m. Central Time

RFB: Elgin Eagle Broom Sweepers
RFB: 05135-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: January 16, 2020 at 11:00 a.m. Central Time

RFB: : Lite Reader Message Boards
RFB: 05202-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: March 10, 2020 at 11:00 a.m. Central Time

RFB: 18 ft. Scissor Lift
RFB: 19022-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: February 11, 2020 at 11:00 a.m. Central Time

RFB: 5000 lb. Forklift
RFB: 19023-NTT-00-GS-MA
Pre-bid meeting: NONE
Responses Due: February 11, 2020 at 11:00 a.m. Central Time

RFB: LLTB E. Approach Rdway & Bridge Deck Drainage Rehab
RFB: 04977-LBB-00-CN-PD
Pre-bid meeting: February 10, 2020 at .2:00 p.m. CT
Responses Due: February 20, 2020 at 11:00 a.m. CT

RFB: PGBT WE Seg. 7 & 8 Frontage Rd. Restriping
RFB: 05121-PGB-00-CN-PD
Pre-bid meeting: February 10, 2020 at . 1:30 p.m. CT
Responses Due: February 20, 2020 at 11:00 a.m. CT

RFB: DNT & SRT Concrete Pavement Joint & Crack Sealing
RFB: 05097-NTT-00-CN-PD
Pre-bid meeting: December 3, 2019 at 10:00 a.m. CT
Responses Due: November 19, 2019 at 11:00 a.m. CT

RFB: Transfer Switches
RFB: 19025-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: February 17, 2020 at 10:00 a.m. Central Time

RFB:Wood Door Replacement – 5910 W. Plano Parkway
RFB: 05161-GEC-00-GS-MA
Pre-bid meeting: January 22, 2020
Responses Due: January 31, 2020 at 10:00 a.m. CT

RFB:IT Infrastructure - CISCO
RFB: 05120-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: October 21, 2019 at 2:00 p.m. Central Time

RFB:IT Infrastructure - PURE
RFB: 05119-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: October 21, 2019 at 2:00 p.m. Central Time

RFB:IT Infrastructure - VMWARE
RFB: 05118-NTT-00-GS-IT
Pre-bid meeting: N/A
Responses Due: October 21, 2019 at 2:00 p.m. Central Time

RFB:Sam Rayburn Tollway, President George Bush Turnpike and Dallas North Tollway Pavement Profiling
RFB: 05079-NTT-00-CN-PD
Pre-bid meeting: November 12, 2019 at 10:00 a.m. Central Time
Responses Due: November 21, 2019 at 10:00 a.m. Central Time

RFB: Construction of MSE Retaining Wall Stabilization on Sam Rayburn Tollway Segment 1
RFB: 04968-SRT-01-CN-PD
Pre-bid meeting: October 11, 2019 at 2:00 p.m. Central Time
Responses Due: November 21, 2019 at 10:00 a.m. Central Time

RFB: First Aid, AED Fulfillment of Supplies and Services
RFB: 18295-NTT-00-GS-TM
Pre-bid meeting: None
Responses Due: November 8, 2019 at 10:00 a.m Central Time

RFB: Medium and Heavy Duty Vehicle Parts & Services
RFB: 05091-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: November 21, 2019 at 10:00 a.m. Central Time

RFC: Traffic Control Services
RFB: 05113-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: November 21, 2019 at 10:00 a.m. Central Time

RFC: Safe Pace 700, 18 in Full Matrix Speed Display Sign
RFB: 19003-NTT-00-CN-PD
Pre-bid meeting: None
Responses Due: December 04, 2019 at 2:00 p.m. Central Time

GE OEM Parts & Services
RFB: 05085-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: November 05, 2019 at 10:00 a.m. Central Time

Ford OEM Parts and Services
RFB: 05084-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: October 17, 2019 at 10:15 a.m. Central Time

General Contracting Services for Light Commercial Construction & Renovation
RFB: 05064-NTT-00-GS-MA
Pre-bid meeting: October 02, 2019 at 10:00 a.m. Central Time
Responses Due: October 17, 2019 at 10:00 a.m. Central Time/p>

Equipment Rental
RFB: 05059-NTT-00-GS-MA
Pre-bid meeting: None
Responses Due: October 11, 2019 at 11:00 a.m. Central Time

Systemwide Pavement Profiling
RFB: 04029-NTT-00-CN-PD
Pre-bid meeting: None
Responses Due: January 16, 2019 at 10:00 a.m. Central Time

Exterior Recoating and Storage Enclosure
RFB: 05027-MSC-GS-MA
Pre-bid meeting: October 15, 2019 at 10:30 a.m. Central Time
Responses Due: October 23, 2019 at 10:00 a.m. Central Time

Construction of DNT Mainlane Extension over US 380
RFB: 04575-NTT-05-CN-PD
Pre-bid meeting: October 9, 2019 at 2:00 p.m. Central Time
Responses Due: October 24, 2019 at 11:00 a.m. Central Time

2020 Raised Pavement Markers (RPMs) Replacement
RFB: 05072-NTT-00-CN-PD
Pre-bid meeting: October 7, 2019 at 2:00 p.m. Central Time
Responses Due: October 24, 2019 at 11:00 a.m. Central Time

Dallas North Tollway Wrong Way Detection and Warning System
RFB: 05015A-DNT-01-CN-SM
Pre-bid meeting: October 1, 2019 at 10:00 a.m. Central Time
Responses Due: October 18, 2019 at 10:00 a.m. Central Time

BOARDROOM AUDIO AND VIDEO SERVICES
RFB: 05058-NTT-00-GS-IT
Pre-bid meeting: September 03, 2019
Responses Due: September 16, 2019 at 2:00 p.m. Central Time

CABLING AND WIRING Maintenance
RFB: 05048-NTT-00-GS-IT
Pre-submittal meeting: None
Responses Due: August 23 , 2019 at 2:00 p.m. Central Time

IXIA Maintenance
RFB: 05054-NTT-00-GS-IT
Pre-submittal meeting: None
Responses Due: August 23 , 2019 at 2:00 p.m. Central Time

Traffic Control Services for Information Technology
RFB: 04991A-NTT-00-GS-IT
Pre-submittal meeting: None
Responses Due: June 20, 2019 at 3:30 p.m. Central Time

Gleneagles Landscape Maintenance Service
RFB: 05017-GEC-00-GS-MA
Pre-submittal meeting: June 10, 2019 at 10:30 a.m. CT
Responses Due: June 25, 2019 at 10:30 a.m. CT

Pre-Emergent and Fertilizer Application
RFB: 05018-NTT-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 18, 2019 at 10:30 a.m. CT

Hardware for Signs
RFB: 05022-NTT-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 28, 2019 at 10:30 a.m. CT

Reflective Sheeting
RFB: 05001-NTT-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 28, 2019 at 10:00 a.m. CT

Safety Vests and Pants
RFB: 04998-NTT-00-GS-MA
Pre-submittal meeting: June 26, 2019 at 9:00 a.m. CT
Responses Due: July 11, 2019 at 10:30 a.m. CT

Safety Footwear
RFB: 04999-NTT-00-GS-MA
Pre-submittal meeting: N/A
Responses Due: July 17, 2019 at 10:00 a.m. CT

System Wide Landscape and Erosion Control
RFB: 04969-NTT-00-GS-MA
Pre-submittal meeting: July 19, 2019 at 1:30 p.m. CT
Responses Due: June 13, 2019 at 10:00 a.m. CT

Automotive and Equipment Tires
RFB: 04893-NTT-00-GS-MA
Pre-submittal meeting: May 28, 2019 at 10:00 a.m. CT
Responses Due: August 6, 2019 at 10:00 a.m. CT

Sound Masking
RFB: 18201A-GEC-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 21, 2019 @ 10:00 a.m. CST

Conference Room Video Upgrade
RFB: 05013A-NTT-00-GS-IT
Pre-submittal meeting: None
Responses Due: July 8, 2019 at 2:00 p.m. Central Time

FOCUS GROUPS
RFB: 18233-NTT-00-GS-CA
Pre-submittal meeting: None
Responses Due: July 03, 2019 at 20:00 p.m. Central Time

STIHL Tools, Parts and Service
RFB: 05006-NTT-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 17, 2019 at 10:00 a.m. CT. Central Time

CONTINUATION OF TWO WAY RADIO SERVICES
RFB: 05004-NTT-00-GS-MA
Pre-submittal meeting: None
Responses Due: June 17, 2019 at 2:00 p.m. Central Time

Imperva SecureVue Subscription Renewal
RFB: 04988A-NTT-00-GS-IT
Pre-submittal meeting: None
Responses Due: May 29, 2019 at 2:00 p.m. Central Time

RFB:Roadside Safety Services Uniforms
RFB: 04906-NTT-00-GS-SM
Pre-Bid Meeting: March 5, 2019 at 10:00 a.m.
Bid Due Date: March 26, 2019 at 10:00 a.m. Central Time

RFB: Sale of Surplus Real Property 5550 Montrose Drive Dallas, TX 75209
RFB: 04862-NTT-00-GS-PD
Pre-Bid: None
Responses Due:February 25, 2019 at 2:00 p.m. Central Time

RFB: SRT Seg. 1 Pavement Rehab and Bridge Bearing Pad Replacement
RFB: 04777-SRT-01-CN-PD
Pre-Bid: January 15, 2019 at 2:00 p.m.
Responses Due:February 01, 2019 at 2:00 p.m. Central Time

RFB: EMC DCX Maintenance
RFB: 18160-NTT-00-GS-IT
Pre-Bid: None
Responses Due:December 17, 2018 at 2:00 p.m. Central Time

RFB: Cisco Phone System Hardware Upgrade
RFB: 04926-NTT-00-GS-IT
Pre-Bid: None
Responses Due:January 02, 2019 at 2:00 p.m. Central Time

RFB: Cisco Hardware Smartnet Renewal
RFB: 04922-NTT-00-GS-IT
Pre-Bid: None
Responses Due:January 02, 2019 at 2:00 p.m. Central Time

RFB: 2019 Commercial Interior Finishing
RFB: 04795-NTT-00-GS-MA
Pre-Bid: November 29, 2018 at 02:00 p.m. Central Time
Responses Due:December 28, 2018 at 2:00 p.m. Central Time

RFB: NTTA Elevator Inspection and Repair for GE 5910, MLP 3, and MLP 4
RFB: 18142-NTT-00-GS-MA
Site Visit: December 11, 2018 at 01:00 p.m. Central Time
Responses Due:December 31, 2018 at 11:00 a.m. Central Time

RFB: Main Lane Plaza 8 Reroofing
RFB: 04859-PGB-21-GS-MA
Pre-Bid meeting: November 26, 2018 at 2:00 p.m. Central Time
Responses Due:December 14, 2018 at 2:00 p.m. Central Time

RFB: Air Conditioning Maintenance for Information Technology
RFB: 04886-NTT-00-GS-IT
Pre-Bid meeting: None
Responses Due:December 27, 2018 at 2:00 p.m. Central Time

RFB: Laptop Refresh
RFB: 04916-NTT-00-GS-IT
Pre-Bid meeting: N/A
Responses Due:December 07, 2018 at 1:00 p.m. Central Time

RFB: 2019 NTTA System wide floor Covering
RFB: 04873-NTT-00-GS-MA
Pre-Bid meeting: November 19, 2018 at 01:30 p.m. Central time
Responses Due:December 18, 2018 at 11:00 a.m. Central Time

RFB: Emergency Communication Upgrade 2018
RFB: 0488-NTT-00-GS-IT
Pre-Bid meeting: None
Responses Due:November 19 , 2018 at 2:00 p.m. Central Time

RFB: Background Screening
RFB: 18039-NTT-00-GS-HR
Pre-Bid meeting: None
Responses Due: October 15, 2018 at 2:00 p.m. Central Time

RFB: ServiceNow Licensing and Support Renewal
RFB: 04872-NTT-00-GS-IT
Pre-Bid meeting: None
Responses Due: October 26 , 2018 at 2:00 p.m. Central Time

RFB: Telephone System Software Maintenance Renewal 2019
RFB: 04907-NTT-00-GS-IT
Pre-Bid Meeting: None
Bid Due Date: December 3, 2018 at 10:00 a.m. Central Time

RFB: STARC Portable Modular Wall System
RFB: 04868-NTT-00-GS-MA
Pre-Bid meeting: None
Responses Due: October 23, 2018 at 11:00 a.m. Central Time

RFB: Sump Pump Annual Inspection and Repair
RFB: 04871-NTT-00-GS-MA
Pre-Bid meeting: October 11, 2018 at 11:00 a.m. Central Time
Responses Due: October 18, 2018 at 1:00 p.m. Central Time

RFB: Concrete Pavement Diamond Grooving SRT
RFB: 04843-SRT-01-CN-PD
Pre-Bid meeting: October 10, 2018 at 2:00 p.m. Central Time
Responses Due: October 19, 2018 at 2:00 p.m. Central Time

RFB: SRT at NE Tributary Young’s Branch Erosion Mitigation
RFB: 04763-SRT-03-CN-PD
Pre-Bid Meeting: October 9, 2018 at 11:00 a.m. Central Time
Bid Due Date: October 11, 2018 at 11:00 a.m. Central Time

RFB: Landscaping Services at AAT, LLBT, Frisco and Plano Operations Center
RFB: 04831-NTT-00-GS-MA
Pre-Bid meeting: September 13, 2018 at 11:00 a.m. Central Time
Responses Due: September 20, 2018 at 2:00 p.m. Central Time

RFB: Construction of SRT Widening from DNT to US 75  
RFB: 04587-SRT-00-CN-PD
Pre-Bid Meeting: September 11, 2018 at 10:00 a.m. Central Time
Bid Due Date: September 21, 2018 at 11:00 a.m. Central Time

RFB: Construction of SRT Widening from Denton Tap to DNT   
RFB: 04586-SRT-00-CN-PD
Pre-Bid Meeting: September 11, 2018 at 10:00 a.m. Central Time
Bid Due Date: September 18, 2018 at 11:00 a.m. Central Time

RFB: Fiber Optic Cable Relocation for SRT 4th Lane Project
RFB: 04848-SRT-00-CN-PD
Pre-proposal meeting: September 11, 2018 at 11:00 a.m. Central Time
Responses Due: September 21, 2018 at 11:00 a.m. Central Time

RFB: Spectra Logic LT06 Tape
RFB: 18073-NTT-00-GS-IT
Pre-Bid Meeting: N/A
Bid Due Date: June 05, 2018 at 2:00 p.m. Central Time

RFB: Call Center Headsets
RFB: 18026-NTT-00-GS-IT
Pre-Bid Meeting: N/A
Bid Due Date: March 30, 2018 at 2:00 p.m. Central Time

RFB: Traffic Control Services for IT Maintenance Operations
RFB: 04845-NTT-00-GS-IT
Pre-Bid meeting: August 29, 2018 at 1pm
Bids Due: 09/11/2018 at 1:00 p.m. Central Time

RFB: Self Seal Mailing Envelopes for NTTA Customer Service
RFB: 04847-NTT-00-GS-CS
Pre-bid meeting: None
Responses Due: September 07, 2018 at 2:00 p.m. Central Time

RFB: Jarr Dan MPL-NGS RSS Recovery Vehicle
RFB: 04863-NTT-00-GS-MA
Pre-Bid meeting: NONE
Bids Due: 09/05/2018 at 11:00 a.m. Central Time

RFB: Traffic Control Services
RFB: 04852-NTT-00-GS-MA
Pre-Bid meeting: NONE
Bid Due: August 23, 2018 at 2:00 P.M. Central Time

RFB: SRT at Young’s Branch Erosion Mitigation
RFB: 04763-SRT-03-CN-PD
Cancellation Notification

RFB: Building Management System Upgrade for Main Lane Plaza 10
RFB: 04805-PGB-27-GS-MA
Pre-bid meeting: July 2, 2018 at 10:00 a.m. Central Time
Responses Due: July 30, 2018 at 11:00 a.m. Central Time

RFB: General Contracting Services for Light Commercial Construction & Renovation
RFB: 04614-NTT-00-GS-MA
Pre-Bid meeting: June 26, 2018, 2018 at 10:00 a.m. Central Time
Responses Due: July 18, 2018 at 4:00 p.m. Central Time

RFB:  Vacuum Excavation Trailer
RFB:  04794-NTT-00-GS-MA
Pre-bid meeting:  None
Responses Due:  July 24, 2018 at 3:00 p.m. Central Time

RFB: STIHL Landscaping and Concrete Power Tools
RFB: 18083-NTT-00-GS-MA
Pre-proposal meeting:
None
Responses Due: June 21, 2018 at 3:00 p.m. Central Time

RFB: Power Distribution Units
RFB: 04760-NTT-00-GS-IT
Pre-bid meeting: None
Responses Due: April 04, 2018 at 10:00 a.m. Central Time

RFB: 2018 Fleet RMF for Vehicles/Equipment Purchases
RFB: 04676-NTT-00-GS-MA
Pre-Bid meeting: February 26, 2018at 03:00 p.m. Central Time
Responses Due: March 07, 2018 at 3:00 p.m. Central Time

RFB: Supplemental Cooling MLP7
RFB: 18064-PGB-15-GS-MA
Pre-proposal meeting: June 19, 2018at 02:00 p.m. Central Time
Responses Due: July 5, 2018 at 3:00 p.m. Central Time

RFB: Recoating of Entry Building and Transmission Building at Main Lane Gantry 3 Original Plaza and Cellular Building
RFB: 04517-DNT-03-GS-MA
Pre-proposal meeting: April 30, 2018 at 3:00 p.m. Central Time
Responses Due: June 5, 2018 at 2:00 p.m. Central Time

RFB: Granular Fertilizer Pre-emergent
RFB: 04779-NTT-00-GS-MA
Pre-Bid Meeting: N/A
Bid Due Date: June 11, 2018 at 2:00 p.m. Central Time

RFB: GE HVAC Preventative Maintenance - Repair
RFB: 04778-NTT-00-GS-MA
Pre-Bid Meeting: N/A
Bid Due Date: June 11, 2018 at 2:00 p.m. Central Time

RFB: Construction of MSE Walls 301-307 PGBT Segment III
RFB: 04056-PGB-03-CN-PD
Pre-Bid Meeting: April 26, 2018 at 2:00 p.m. Central Time
Bid Due Date: May 23, 2018 at 2:00 p.m. Central Time

RFB: 2018 CCTV Camera Inventory
RFB: 04732-NTT-00-GS-IT
Pre-Bid Meeting: N/A
Bid Due Date: February 21, 2018 at 2:00 p.m. Central Time

RFB: Dumpster Service
RFB: 04669-NTT-00-GS-MA
Pre-Bid Meeting: N/A
Bid Due Date: February 22, 2018 at 2:00 p.m. Central Time

RFB: PGBT WE Pavement Profiling
RFB: 04496-PGB-00-CN-PD
Pre-Bid Meeting: March 14, 2018 at 2:00 p.m. Central Time
Bid Due Date: March 22, 2018 at 2:00 p.m. Central Time

RFB: LLTB Restriping
RFB: 04712-LLB-00-CN-PD
Pre-Bid Meeting: April 11, 2018 at 2:00 p.m. Central Time
Bid Due Date: April 24, 2018 at 2:00 p.m. Central Time

RFB: DNT/PGBT Interchange Restriping
RFB: 04713-NTT-00-CN-PD
Pre-Bid Meeting: March 15, 2018 at 2:00 p.m. Central Time
Bid Due Date: March 23, 2018 at 2:00 p.m. Central Time

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​